• <sub id="kz37i"></sub>

      <center id="kz37i"></center>
      <output id="kz37i"></output>

      <style id="kz37i"></style>

      亚洲国产精品无码观看久久,精品国产乱码久久久久乱码,日韩一区精品视频一区二区,亚洲综合无码一区二区,狠狠五月深爱婷婷网,麻豆人人妻人人妻人人片av,国产又大又粗又爽的毛片,精品国产三级a∨在线欧美
      Over 1 GWh Across Three Stages, Zhiguang Energy Storage and Chuangyuan Metal Set a New Standard for Grid-Forming Storage and Green Power
      • 20
      • 2025.11.28

      Inner Mongolia Chuangyuan Metal Co., Ltd. and Guangzhou Zhiguang Energy Storage Technology Co., Ltd. (“Zhiguang Energy Storage”) signed the Phase III cooperation agreement for their integrated renewable–grid–load–storage project. With the completion of Phases I, II, and III, the total capacity of grid-forming cascade high-voltage energy storage now exceeds 1 GWh, setting a new industry record for user-side grid-forming storage deployments.

      Since 2024, the two parties have deepened collaboration across project development, forming a full-chain partnership covering technology R&D, engineering implementation, and system integration. This has enabled large-scale application of grid-forming cascade high-voltage storage for heavy industrial loads and created a replicable model for high-consumption enterprises seeking stable green power supply and low-carbon transformation.

      Deep Collaboration Under Strong Policy Momentum: Total Scale Surpasses 1 GWh Across Three Phases


      All three project phases are located in the industrial park of Holingol, Tongliao, Inner Mongolia, and are equipped with Zhiguang Energy Storage’s independently developed grid-forming cascade high-voltage storage system. With the release of the National Energy Administration’s new guidelines promoting deeper integration of renewable energy, grid-forming capabilities have become mandatory for new energy grid connection. Leveraging abundant wind and solar resources on the Horqin Grassland, the partners have jointly built a coordinated “wind-solar-storage-load” green energy ecosystem.

      ? Phase I (Chuangyuan Metal): Completed the world’s first joint black-start test combining grid-forming cascade high-voltage storage with a coal-fired unit, earning recognition as an outstanding local demonstration project in Inner Mongolia.

      ? Phase II (Chuangyuan Keyou New Energy): Equipped with 72 battery containers and 4 grid-connection modules, offering full-scenario grid services including frequency regulation, peak shaving, and black start.

      ? Phase III (Chuangyuan Keyou New Energy): Further enhances the full “renewable–grid–load–storage” loop and strengthens regional grid support capabilities.


      With a combined capacity exceeding 1 GWh, the project is now one of China’s largest user-side grid-forming energy storage demonstrations, providing a strong foundation for large energy-intensive enterprises to absorb green power at scale.

      Grid-Forming Technology Enables Stable Green Power Supply for Industrial Operations


      Despite abundant wind and solar resources, the Horqin region faces harsh weather conditions—extreme cold, heat, and strong winds—combined with the intermittency of renewables, posing major challenges for continuous industrial production. For Chuangyuan Metal, whose operations rely on high load and high reliability, securing stable, high-quality renewable power became a core requirement.

      Zhiguang Energy Storage’s grid-forming cascade high-voltage system uses “self-synchronizing voltage source” control to actively establish grid voltage and frequency, delivering strong inertia support and wide short-circuit ratio adaptability. In Phase I, the system successfully achieved black start and synchronized grid connection of the supporting coal-fired unit, proving its ability to maintain stability under extreme conditions.


      “This system functions like both a ‘power buffer’ and an ‘emergency supply’ for the factory,” noted the Chuangyuan project lead. With the system’s advantages—“simplified plant design, strong grid-forming capability, higher efficiency, and superior safety”—green power utilization can be significantly increased. Even during sudden wind output drops or grid disturbances, the system responds instantly, preventing production interruptions and ensuring truly uninterrupted green-power direct supply.

      A Benchmark for Industrial Decarbonization


      The collaboration between Zhiguang Energy Storage and Chuangyuan Metal combines grid-forming storage, wind and solar generation, and industrial load into a highly integrated model, charting a new path for aligning low-carbon development with efficient production. It maximizes renewable energy consumption, reduces power costs, and enhances supply reliability.

      This model sets a pioneering example for energy-intensive industries nationwide. As the dual-carbon strategy accelerates, sectors such as steel, electrolytic aluminum, and alloys face urgent demand for green-power substitution. Grid-forming cascade storage is emerging as the “golden key” to achieving reliable renewable power supply.


      A representative from Chuangyuan emphasized that the Phase III cooperation is a crucial step in the company’s green transition. As the full project comes online, this end-to-end energy solution—covering generation, storage, and consumption—will continue to unleash green momentum across the Horqin region, speeding the shift toward a cleaner energy structure and establishing a benchmark for direct green-power supply, contributing actively to China’s dual-carbon goals.

      主站蜘蛛池模板: 亚洲精品久久久久久无码色欲四季| 精品一区二区免费不卡| 国产一区二区在线影院| 中文字幕人妻无码一区二区三区| 免费AV片在线观看网址| 亚洲精品久荜中文字幕| 国产福利社区一区二区| 色噜噜亚洲男人的天堂| 日韩高清免费一码二码三码| 国产精品一区久久人人爽| 日本中文字幕乱码免费| 欧洲美熟女乱又伦免费视频| 亚洲夜色噜噜av在线观看| 国产精品麻豆成人av电影艾秋| 午夜射精日本三级| 99久久er热在这里只有精品99| 国产av麻豆mag剧集| 人妻无码久久精品| 国产成人高清精品亚洲| 欧美乱妇高清无乱码免费| 亚洲国产精品成人av网| 好吊妞视频这里有精品| 五月丁香啪啪| 色综合天天综合天天更新| 亚洲国产午夜精品理论片| 欧美日产国产精品日产| 91蜜臀国产自产在线观看| 亚洲精品日本久久一区二区三区| 精品在免费线中文字幕久久| 男人扒女人添高潮视频| 全黄h全肉边做边吃奶视频| 亚洲中文字幕有综合久久| 亚洲精品熟女一区二区| 午夜国产理论大片高清| 韩国 日本 亚洲 国产 不卡| 四虎成人在线观看免费| 男女无遮挡激情视频| 国产av午夜精品福利| 狠狠躁夜夜躁人人爽蜜桃| 国产桃色在线成免费视频| 精品一区二区不卡无码AV |